Rig Condition Survey and CAT IV Inspection for ERIELL Group (Uzbekistan)

Client: ERIELL Group
Provided services: Rig Inspection Services
Duration: 2024 (33 days)
Location: Uzbekistan

Project description
In 2024 ALMAEER was awarded a contract to provide Rig Inspection Services for ERIELL GROUP on their land rig ZJ-70 based in Uzbekistan.

The rig was planned to be deployed for an international drilling project outside Uzbekistan and required a thorough evaluation of its technical condition and compliance with international standards.

Scope of Work and Activities
This Project consisted of two main phases: 

  • Phase 1 – Rig Condition Survey. A detailed assessment the overall technical condition of the rig and its associated equipment.
  • Phase 2 – API RP 4G CAT IV Inspection (including NDT Inspection). A comprehensive Category IV inspection in accordance with API RP 4G/8B/7L.

The objectives of the inspection and audit program included:

  • Assess equipment availability and readiness as per Client Audit Procedure for Drilling, Workover and Well Service Units.
  • Assess the technical condition of the rig and associated equipment for upcoming project(s).
  • Fully recertify the drilling unit and associated components to all recognized local and international standards, covering API STD 53 / API RP 4G/8B/7L CAT inspections.
  • Safety and Environmental Critical Elements Management.
  • Review the Contractor Management System with respect to rigs and associated equipment and assess their implementation.
  • Assess the contractor`s personnel level of training and competence.
  • Assess sub-contractor’s management.


Project Outcome
The findings and recommendations enabled ERIELL to address identified deficiencies, confirm the rig’s readiness for international deployment, and ensure the compliance with applicable industry standards.