Rig condition surveys for TAQA(Almansoori)/National Oilwells Drilling & Workover Company (Libya)
Rig condition surveys for TAQA(Almansoori)/National Oilwells Drilling & Workover Company (Libya)
Client: TAQA(Almansoori)/National Oilwells Drilling & Workover Company Provided services: API RP 4G, 7L, 8B CAT III/ CAT IV Inspection Duration: 2022 (10 days) Location: Libya
Project description
TAQA(Almansoori) in cooperation with National Oilwells Drilling & Workover Company requested ALMAEER to perform the following services for their rigs and units located in Libya:
Inspecting and certifying to API RP 4G Cat III Mast & Substructure Inspections to Rig 7 operated by NWD Libya.
Inspecting and certifying to API RP 4G Cat IV Mast & Substructure Inspections to Rig 35 operated by NWD Libya